The Miller/Potter Project

3/29/2005

100_1410a 100_1414a 100_1472a 100_1489a 100_1491a
After  muuch sanding and many coats of polyurethane The granite countertops are installed Finishing up laying down the bamboo flooring The easy part of laying the travertine in the shower Bought 200 tiles and ended up with 6 leftover
100_1504a 100_1513a 100_1514a 100_1516a 100_1520a
Ipe deck with stainless steel railing Westfield and Jag finally back home About 6 full days of laying tile Bathroom getting close to being done Still lacking a mirror and glass shower door
100_1522a 100_1524a 100_1525a 100_1526a 100_1529a
Great room/kitchen from stairs Kitchen nearly done Lacking door pulls, but a useable kitchen We LOVE it! Emma seems to like the new space!